Proposed Residential Development at Penny Farm, Penny Close, Saundersfoot, Pembrokeshire, SA69 9LA

JCR Planning has been instructed to undertake a pre-application consultation in respect of a proposed development as required by the Town & Country Planning (Development Management Procedure)(Wales)(Amendment) Order 2016.

The proposed development at Penny Farm, Penny Close, Saundersfoot, Pembrokeshire, SA69 9LA, comprises 25 units of residential accommodation. The relevant pre-application documents can be viewed via the links below.

Anyone wishing to comment on the proposed development must do so by the 17th January 2022 either by emailing info@jcrplanning.com or by posting to JCR Planning Ltd., Units 2 & 3 Cross Hands Business Workshops, Heol Parc Mawr, Cross Hands, Carmarthenshire, SA14 6RE. 

Appl Form

A3 LOCATION PLAN

Site Layout (4)

Design and Access Statement (PAC)

3 Bed Ter FF

3 Bed Ter GF

3 Bed Terrace ele4 bed house floor plans

4 bed house eles

Flat Floor Plan

Flat Layout

Flats Elevations

 

 

Proposed Change of Use of land from Scrap Metal Storage to Metal Recycling, Vehicle Storage, Depollution and Dismantling (Authorised Treatment) Facility at Unit C, G Building, Carew Pavilion, Carew Airfield, Carew, Pembrokeshire, SA70 8SX

Proposed Change of Use of land from Scrap Metal Storage to Metal Recycling, Vehicle Storage, Depollution and Dismantling (Authorised Treatment) Facility at Unit C, G Building, Carew Pavilion, Carew Airfield, Carew, Pembrokeshire, SA70 8SX

JCR Planning has been instructed to undertake a pre-application consultation in respect of a proposed development as required by the Town & Country Planning (Development Management Procedure)(Wales)(Amendment) Order 2016.

The development at Carew Airfield, Carew, Pembrokeshire, SA70 8SX, comprises the proposed change of use of land from scrap metal storage to metal recycling, vehicle storage, depollution and dismantling (authorised treatment) facility. The relevant pre-application documents can be viewed via the links below.

Anyone wishing to comment on the proposed development must do so by the 6th September 2021 either by emailing info@jcrplanning.com or by posting to JCR Planning Ltd., Units 2 & 3 Cross Hands Business Workshops, Heol Parc Mawr, Cross Hands, Carmarthenshire, SA14 6RE. 

CONSULTATION NOW CLOSED

Proposed Use of land as Touring Caravan Site (86 no. units) at Gateway Resort, Bynea, Llanelli

JCR Planning has been instructed to undertake a pre-application consultation in respect of a proposed development as required by the Town & Country Planning (Development Management Procedure)(Wales)(Amendment) Order 2016.

The development at Gateway Resort, Bynea, Llanelli, Carmarthenshire, SA14 9SN, comprises the proposed use of land as a touring caravan site for 86 units. The relevant pre-application documents can be viewed by means of the links below.

Anyone wishing to comment on the proposed development must do so by the 9th August 2021 either by emailing info@jcrplanning.com or by posting to JCR Planning Ltd., Units 2 & 3 Cross Hands Business Workshops, Heol Parc Mawr, Cross Hands, Carmarthenshire, SA14 6RE. 

CONSULTATION NOW CLOSED