JCR Planning has been instructed to undertake a pre-application consultation in respect of a proposed development as required by the Town & Country Planning (Development Management Procedure)(Wales)(Amendment) Order 2016.
The application relates to land at Parke Farm, Merrion, Pembroke, and proposes the establishment of a summer campsite for up to forty tents, touring caravans and campervans, along with associated infrastructure, drainage, electrical service hook ups and sanitary facilities.
The application site comprises a small area of Parke Farm, previously utilised as a camping site, under the various permitted development exemptions. The intention is to create level camping pitches, as well as:-
- drainage for new sanitary facilities
- electrical connections network and transformer upgrade
- site broadband installation
- extensive landscaping
- shop facility
- EV charging points
Full details of the proposal are contained in the accompanying pre-application documentation which can be viewed via the links below.
Anyone wishing to comment on the proposed development must do so by the 5th December 2022 either by emailing info@jcrplanning.com or by posting to JCR Planning Ltd., Units 2 & 3 Cross Hands Business Workshops, Heol Parc Mawr, Cross Hands, Carmarthenshire, SA14 6RE.
CONSULTATION NOW CLOSED