Proposed Photo-Voltaic Solar Farm and Attendant Infrastructure and Equipment including Office/Exhibition/Accommodation Building, Substation, Inverters, Transformers, Access Track, Monitoring Equipment, Landscaping, Fencing and Drainage at Morfa Pingett, Pinged, Kidwelly, Carmarthenshire, SA16 0JE

JCR Planning Ltd have been asked to undertake a pre-application consultation (PAC) process in respect of the above proposed development as required by the Planning (Wales) Act 2015 and the Town & Country Planning (Development Management Procedure)(Wales)(Amendment) Order 2016.  The draft planning application comprises of a number of plans, documents and statements which can be viewed by simply clicking on that item listed below.   

Commencing on the 31st January 2020, members of the public, statutory bodies and other third parties have a minimum period of 28 days in which to make representations.  Therefore, these representations should be received no later than 29th February 2020.

Borehole Records

Construction Transport Management Plan

Infiltration and SuDS Report

LVIA and plans Mackley v2 (4)A

APPL FORM PDF

LVIA photo sheets v2

Morfa Pinged FCA Report

Morfa Pinget OHMP

Morfa Pingett Extended Phase 1 Ecology Report

Morfa Pingett Shadow HRA

Natural Ground Stability Report

Noise and Vibration Assessment

Solar Photovoltaic Glint and Glare Study

Topographical Survey

PDAS

A2 MISC STRUCTURES PINGED JAN 2020

A1 SECURITY FENCE PINGED JAN 2020

A1 BLOCK LAYOUT PINGED JAN 2020

A1 PAVILION ELEVS-FLOOR PLANS PINGED JANUARY 2020

CCC EIA SCREENING OPINION